Every utility strike Creates risk to the public, infrastructure, emergency services, project schedules, and client operations. Pro Comm Built a Damage Prevention Operating system focused on measurable field performance.
The industry accepts damages, Pro Comm does not!
1 Damage per 1,000 incoming requests = 1,000 damages per 1,000,000 tickets
1 Damage per 192,000 incoming requests = 5 damages per 1,000,000 tickets
At high ticket request volumes, operational discipline becomes measurable. The gap between Industry Performance and Pro Comm Performance represents a completely different level of risk exposure!
The utility locating industry continues to face significant damage prevention challenges
That difference alone changes outcomes dramatically !
The real service is not about paint marks, its operational discipline designed to drive damage risk towards zero !
Damage prevention goes beyond 811. Our support starts at the ‘Design’ phase, extending well into the “Call Before You Dig” responsibilities and all the way into As-built documentation.